?On April 8th, the "Four-All" pipeline welding inspection robot technology equipment system independently developed by our country was put into
View details
?In February, the daily production of coalbed methane in Qinshui coalbed methane field of Huabei Oilfield continued to maintain a high operating state of more than 7.2 million cubic meters.
View details
The 21st Tianjin Industry Expo (CIEX) will be held at the National Convention and Exhibition Center (Tianjin) from March 6 to 9.
View details
?At 13:00 today, with the issuance of gas production instructions, the production valve of Nanpu No. 1 gas storage well of Jidong Oilfield Branch of petrochina Co., LTD.,
View details
?At 15:58 on November 12, with the opening of the last valve room No. 2 of Qinggao Line (Qing1 gas collection Station to Gaoshawo), natural gas in Ningqing block of Yumen Oilfield
View details
On August 22, the oil and gas produced by the oil Wells under the supervision of Wangxuzhuang Oilfield in Dagang was directly transported to the joint station
View details
As of October 31, 1,750 Wells had been drilled and 997 Wells had been put into operation in the production capacity construction of the self-operating area of Changqing Gas field
View details